As I recall, July
last year was a busy month! One of the big decisions at that time was to remove a wall surrounding the stairs in the hallway and build a hand rail. Lately I have been really appreciating our decision, as the hallway is a very comfortable and functional space.
We spent a long time figuring-out the railing in our hallway landing. After studying stair parts catalogs from local lumbar yards, we found that most parts were available off-the-shelf with exception of the newel posts. Newels are the large columns at the junctions and terminations of a railing, and is often one of the focal points. Box newels were quite common in the era or our home, and luckily we like the look of this design. However, as we need two and one-half newel posts for our hand rail, the cost of these components alone would have broken our budget. So, I decided to design and build our own newel posts.
Most of the surface pieces were originally drawer fronts from a local Building 9 supply store. My dad and I spend a weekend afternoon with his radial arm saw, cutting 45 degree angles on a tall stack of parts.
In order to make a reliable and sturdy hand rail, the surface parts were secured to a solid poplar core. A local lumber yard planed the cores to my specifications and made a few door jamb parts. The surface parts are secured by liquid nails and finishing nails, as well as wood glue near the seams. The raw core was visible on the lower half of the post during the assembly stages, and actually was exposed until the final finishing stage when skirt pieces were attached.
Caps for the newels were created by mounting miniature crown molding on top a 1 inch thick oak plank. By wrapping the molding around a center post, a flat surface was established at the top where I can set toys or a water bottle. The square plank was cut large enough to provide a lip around the molding where I can set a pen or my glasses. Even though it looks like a small part, I was nervous during assembly, due to the high visibility and regular handling.
During a big push towards the end of the year, we stained and varnished all the handrail parts as well as door jambs and casing for the second story broom closet. My youngest brother Ed, my mom and even my father-in-law each helped with the process; however, I wanted to be responsible for the the posts, caps and skirts. I was rather anxious during the finishing stages, since the design and assembly required so much time and energy. (I figured that if the newels were ruined at this point, then I had better be the the one to blame.) Happily, all the parts looked great after a few layers of stain and varnish!
Amanda has a great article describing the assembly process, but here is a final photo of the finished product, as intalled in our hallway upstairs. What a big project, and what a big difference in the quality of our home!
Showing posts with label upstairs hallway. Show all posts
Showing posts with label upstairs hallway. Show all posts
Thursday, July 12, 2012
Monday, March 5, 2012
Carpeting!
The nursery, stairs, and upstairs hallway were carpeted just before Christmas. The Guest Room's carpet wasn't ready until just before the new year.
But, before the carpeting could be installed on the stairs, the old carpeting had to be torn out...
But, before the carpeting could be installed on the stairs, the old carpeting had to be torn out...
Looking Down
Looking Up
Mmmm....mint green and salmon pink
Ahhh! Much better!
What a difference!
It is really coming along nicely.
Looking towards Guest Room
Standing in front of Guest Room doorway
It doesn't look like the same upstairs anymore!
Close-up of the hall and stairway carpeting
Hall Closet
We used some leftover Pergo flooring from my Craft Room
With the trim added
Nursery
As soon as the carpet installers left, I went upstairs and rolled on the nursery floor. LOL!
Guest Room
Labels:
carpeting,
closets,
demolition,
floor,
guest room,
nursery,
stairs,
upstairs hallway
It's About Time for an Update!
I'm finally able to update! Yea! I apologize for taking so long. Jim has been working on a post about his newel posts, but he is taking forever with it, so I'm going to go ahead and post some pictures of the installation.
The Shoe Rail
1/2 Newel Post Up with 1 Side of Balustrade
Coming Along
We don't have blueprints for the house; so instead, we placed a blue note and a 2011 nickel in the newel post.
Almost Finished!
Looking Good!
Happy Birthday to me!
The upstairs hallway is probably starting to look more like it used to prior to the 1960's.
Jim will hopefully finish his post about the installation one of these days.
Tuesday, December 6, 2011
Where We Stand
I've been playing around with our camera's panoramic function. I haven't quite gotten the hang of it yet, but I wanted to post some pics of our progress. These were the best of the bunch. ^_^*
Nursery
Guest Room
Hallway
When we have finished these rooms, I will break out our tripod and take better panoramic pics to show you.
Last night, I was finally able to decorate the Christmas tree while Jim was outside staining.
I still need to add the tree skirt. We also need to find a decent tree topper. We looked for one last year, but didn't find one that we liked. We'd like to find a star that lights up instead of an angel with a tree stuck up its butt. LOL! We put the tree in our dining room this year since the library is still full of stuff for our upstairs projects.
Stocking Feeder for the Birds
If we get around to putting lights up outside, I'll take a picture of them. I'd like to at least get a picture of our Christmas tree from outside.
Mutiny! I'm Taking This Blog Back!
After Avonlea was born, we decided to split our 2 blogs between us. I would write mostly on Bloggle Baby, and Jim would take over Blue Century Home. Unfortunately, it turns out that Jim isn't much of a blogger (as is quite evident); so, I'm reclaiming this blog. ^_^
Since we've made quite a bit of progress, and it would take me forever to give each piece justice, I'll just do a quick recap of the past 3 months.
We utterly failed at finishing the nursery before Avonlea was born. In fact, we are still working on it. However, we have made some significant progress on the upstairs. The walls and ceilings are painted, trim is completed in both bedrooms (except for the closet baseboards), carpeting is picked out and ordered, and we have finished staining all the stair parts and hallway woodwork.
Here is a picture of Jim holding Avonlea in the nursery before the window trim was up.
Our sliding 5 panel closet doors that we bought way back in April-ish.
Our 4 panel door
The windows with custom-made window sills
The trimmed-out Guest Room
This is a picture of Jim ironing on the veneer for the landing.
The stair landing balusters lined up in our garage for staining.
Jim has spent a lot of time and effort on building the newel posts. I would post pics, but I'll leave that to Jim. He wants to write about how he built them, and I don't want to give away any spoilers. All I will say is that I think they look great! :)
As I've mentioned earlier, we have ordered the carpeting for the upstairs. We have chosen Shaw Stainmaster carpeting. The hallway and stairs will be a medium brown with a leaf pattern. The nursery will be a light beige and the guest room will be a light grey. Jim wanted to go lighter in the hallway and stairs, but I was adamant not to go too light. I don't feel like having to constantly clean the carpet (especially on the stairs).
Hallway and Stairs:
Style: Lasting Color: Amaretto
Nursery:
Style: St Amien II Color: Bridal Veil
Guest Room:
Style: St Amien II Color: Mineral Alloy
Right now, they are scheduled to install the carpeting on Dec. 22nd. If all goes well, Avonlea might have her nursery by Christmas. ^_^* Well, almost...her closet won't be completed by then since we want to try something fancy besides just a single rod for clothes to hang on.
Labels:
floor,
guest room,
nursery,
paint,
reconstruction,
stairs,
trim,
upstairs hallway
Tuesday, November 15, 2011
Look at those colors!
Once all of the wall spaces and cleilings were freshly primed, we formed color-teams to fill them in. Amanda worked hard to find the perfect colors for the rooms. After a few weekends of painting, and with my parents' help, our project spaces are looking more finished than ever.
We have a charming nursary in light Sage Green, which will eventually be decorated with songbird theme.
Also, We have a comfortable Lilac Time purple/grey/blue guest room, where you may stay when you visit. This photo also shows the custom windowsill we built. The windowsills are designed to be an easy transition between the window caseing and the baseboards, as the large windows are so low to the floor.
The interconnecting hall is in traditional Lyndhurst Timber, and will look remarkable with the stained wooden handrail and built-in shelf.
We have a charming nursary in light Sage Green, which will eventually be decorated with songbird theme.
Also, We have a comfortable Lilac Time purple/grey/blue guest room, where you may stay when you visit. This photo also shows the custom windowsill we built. The windowsills are designed to be an easy transition between the window caseing and the baseboards, as the large windows are so low to the floor.
The interconnecting hall is in traditional Lyndhurst Timber, and will look remarkable with the stained wooden handrail and built-in shelf.
Friday, October 28, 2011
Painting by numbers
It sure seems like a while ago that we were doing all this painting. During the first weekend in September, my parents came to help prime all of the drywall we had recently finished finishing. Mom and Dad are a great team, and they white-washed the bedrooms and hallway in no time.
Dad and Mom working diligently.
While they were upstairs working with white primer, Amanda and I were out in the garage working with white paint on our surplus of window and door casings and baseboards . As Amanda had a limited number of comfortable maternity clothes, she also wore a blue disposable coverall. Incidentally, she looked like a blue M&M with a paint brush.
Jim and Amanda pretending to work while no one was looking.
Soon enough, our working construction zone was gone. Evidence of the rough original studs, electrical wiring and insulation was only barely visible along the bottom edge of the wall. All of the measurement notes, chalk lines and repair work on the drywall had been replaced with a fresh clean coat of while primer. We now had a 'blank canvas' that resembled two bedrooms and a hallway!
How refreshing, it looks better already!