Showing posts with label floor. Show all posts
Showing posts with label floor. Show all posts

Thursday, September 6, 2012

The Laundry Center

Half-way through June, Amanda told me that the clothes washing machine was not operating as it should. After running a normal load of laundry, an abnormal puddle would be all over the floor. Hoping for a quick and easy repair, I opened the machine and watched for the source of the leak. Unfortunately, the seal at the very core of the drum dribbled during agitation and streamed during the spin cycle. If I were to spend the time, energy and money to repair the seals and bearings of the 10+ year old machine, in the end it would only be a temporary fix. After rigging-up a band-aid to catch the discharge, it looked like we were in the market for a new washing machine.

We have previously discussed redesigning the basement laundry station; however, that plan was supposed to be further down our project list. The current washer and dryer were arranged such that it was difficult not to drop a wet sock on the dirty cellar floor. The two machines were practically 15 foot apart, due to available plumbing and ventilation connections. In order to make the laundry center more accommodating, we intended to arrange the units side-by-side near the current dryer location.

A dedicated 15A breaker was already run to a receptacle for the dryer, so no further electrical work was required. However, some plumbing would be necessary in order to extend the hot and cold lines, as well as route the expelled water to the corner sump pump. Before this though, we needed to build-up a level concrete pad where the new machine would sit.

Jim pretending to be hard at work.

The original dryer was sitting on a raised pad. We decided to extend this peninsula into the corner, and add a few feet on the opposite side as well. The final pad is a 12 foot step-up into the corner, and is as level as I can manage.

New cement pad pretending to have always been there.

We wanted to create a clean work space for the new laundry center, and adhesive-backed vinyl tiles looked like a perfect flooring solution. After studying our options, and building a mosaic collage on the floor at the hardware store, we picked out two complimentary tile patterns for a checkerboard pattern. Both tile patterns look like flagstone, and provide a clean yet natural look. As a finishing step, vinyl baseboards and stair nosing will be applied to the borders and the edges of the raised pad. Surprisingly, laying-out 12x12in stickers on the ground takes a good bit of time and energy! 

New floor tiles pretending not to be completely awesome.

I needed a few new tools and some new skills in order to tackle the plumbing aspects of this project. After some research and some practice, I was able to piece together the new hot and cold lines. The appropriate valves were soldered in place and the whole assembly was connect to the existing plumbing. The exit plumbing was more easily accomplished with standard drain parts and PVC pipe. With no evidence of leaking joints, the plumbing system was ready for connection to a new wash basin and washing machine. This straightforward plumbing job was a good introduction and an engaging puzzle; I think I would be comfortable doing this again.

Old pipes pretending not to notice the new pipes.

We actually ordered a new washer and dryer, in order to replace the aged and mostly functional units. An honest-to-goodness shop, Daly's Appliance, delivered our sparkling new Speed Queen washing and drying machines. They connected the units and made sure that they were working properly before hauling-away the old faulty ones. Let me say that these guys were great! Over the following weekend, I fussed with the dryer ventilation. After adding a second overhead fluorescent lamp, our new laundry center was fully functional and ready for work!

Speed Queen washer and dryer pretending not to be kings of laundry.

While this project was not on our priority list, it presented a good challenge and I learned a few new tricks along the way. The result is a proper work station that should serve us well in the future.

The finished product doesn't have to pretend whatsoever. It is great!

Monday, March 5, 2012

Carpeting!

The nursery, stairs, and upstairs hallway were carpeted just before Christmas.  The Guest Room's carpet wasn't ready until just before the new year.
But, before the carpeting could be installed on the stairs, the old carpeting had to be torn out...

Looking Down

Looking Up
Mmmm....mint green and salmon pink

 Ahhh!  Much better!

What a difference!

It is really coming along nicely.

Looking towards Guest Room

Standing in front of Guest Room doorway

It doesn't look like the same upstairs anymore!

Close-up of the hall and stairway carpeting

Hall Closet
 We used some leftover Pergo flooring from my Craft Room

With the trim added

Nursery
As soon as the carpet installers left, I went upstairs and rolled on the nursery floor.  LOL!



Guest Room



Tuesday, December 6, 2011

Mutiny! I'm Taking This Blog Back!

After Avonlea was born, we decided to split our 2 blogs between us.  I would write mostly on Bloggle Baby, and Jim would take over Blue Century Home.  Unfortunately, it turns out that Jim isn't much of a blogger (as is quite evident); so, I'm reclaiming this blog.  ^_^
Since we've made quite a bit of progress, and it would take me forever to give each piece justice, I'll just do a quick recap of the past 3 months.
We utterly failed at finishing the nursery before Avonlea was born.  In fact, we are still working on it.  However, we have made some significant progress on the upstairs.  The walls and ceilings are painted, trim is completed in both bedrooms (except for the closet baseboards), carpeting is picked out and ordered, and we have finished staining all the stair parts and hallway woodwork.

Here is a picture of Jim holding Avonlea in the nursery before the window trim was up. 

Our sliding 5 panel closet doors that we bought way back in April-ish.

Our 4 panel door

The windows with custom-made window sills

The trimmed-out Guest Room

This is a picture of Jim ironing on the veneer for the landing.

The stair landing balusters lined up in our garage for staining.

Jim has spent a lot of time and effort on building the newel posts.  I would post pics, but I'll leave that to Jim. He wants to write about how he built them, and I don't want to give away any spoilers.  All I will say is that I think they look great!  :)
As I've mentioned earlier, we have ordered the carpeting for the upstairs.  We have chosen Shaw Stainmaster carpeting.  The hallway and stairs will be a medium brown with a leaf pattern.  The nursery will be a light beige and the guest room will be a light grey.  Jim wanted to go lighter in the hallway and stairs, but I was adamant not to go too light.  I don't feel like having to constantly clean the carpet (especially on the stairs).
Hallway and Stairs:
Style: Lasting  Color: Amaretto
Nursery:
Style: St Amien II  Color: Bridal Veil
Guest Room:
Style: St Amien II  Color: Mineral Alloy
Right now, they are scheduled to install the carpeting on Dec. 22nd.  If all goes well, Avonlea might have her nursery by Christmas.  ^_^*  Well, almost...her closet won't be completed by then since we want to try something fancy besides just a single rod for clothes to hang on.


Monday, July 11, 2011

Busy Bees!

Once again, my in-laws came out to help with the house renovations.  Thank goodness!  We could really use it!  LOL!
This past weekend, they worked on finishing leveling the floor in the hallway, insulating the hallway, and continuing to mud the nursery and guest rooms.  They all have done an amazing job, and it is really starting to come together.  The hallway looks awesome!  I'm excited to see the finished product.  We have really made quite a change in that hallway by knocking down 3 walls and adding in a corner closet and built-in.  It is going to look so good!!!  I can hardly wait!  We are still on the hunt for the newel posts, spindles, and handrail for the upstairs landing.  If anyone knows of a place they can recommend, please let us know!  We don't want to spend more than $100 per newel post (we need 2 1/2), yet we want ones that are at least 4 1/2" in width to make them feel more authentic for the age of our home.  

Picture Time!

Leveled Floor in Hallway

Insulation on Ceiling and Walls in Hallway
 (Looking Towards Nursery)

More Hallway Insulation
 (Looking Towards Guest Room)

Mudding so far in Nursery

Mudding so far in Guest Room

One of the nights when we were all eating dinner, we had an unexpected house guest.  Jim looked up to see a  big ol' fat ground hog staring in at us from our front door stoop.  We've never noticed a ground hog before, so it was a complete surprise.  He was just sitting there as if waiting for us to invite him in.  LOL!  He didn't seem afraid of us at all.  After a few moments, he calmly walked off to lounge under one of the bushes we have out front.  Maybe the septic guys destroyed his home when we had the new septic installed...