Showing posts with label family room. Show all posts
Showing posts with label family room. Show all posts

Wednesday, May 18, 2011

Wait! Is that snow?!

Oh, no.  It's just the dandelion fluff blowing around in the wind since we haven't been able to mow our lawn.  It's gotten ridiculous.  You can't even see the birds bopping around in the grass because it is so tall!  The rain has pretty much been relentless.  On the rare sunny day, we've had other things we needed to do.  *Sigh*  It is supposed to be sunny on Friday.  Maybe we'll be able to mow it then.

This rain isn't helping our septic either.  We've been needing to pump the tank and well at least once a week.  We have made some marginal progress though.  We finally heard back from the county health inspector.  When 2 weeks passed and we hadn't heard back from him, Jim called him.  Apparently, he had our application confused with someone else's.  Grrrr!!!!  He has determined that the only feasible septic system for us would be a type that discharges off lot into the road storm drain.  Because of this, we have to apply to the Ohio EPA for a special permit.  This of course means more $ and another 2 week wait.  The inspector did give us the go-a-head to get quotes from various septic contractors/excavators.  I've managed to find 3 in the area that have "A" ratings from the BBB.  All 3 have come out to the house, but we are still waiting for the final quote before we make our decision.  Each contractor had a different opinion on the type of system to use.  The first one says to go with Pump A.  The second one says to stay away from Pump A and go with Pump B.  The third one says we don't even need a pump and can just use a gravity system.  *Sigh*  Great!  How can you all have such high ratings from BBB, and differ so much on your recommendations?!  Once the last quote comes in, I'll need to sit in front of the computer and research it myself.  By the time this is all over, I'll be the Queen of Septic Knowledge...not exactly a title I'd like to have.  LOL!

In home remodeling news, Jim has started the demolition in the upstairs hallway.  Poor fellow had to do it by himself.  He didn't want me to help since I'm now in my 2nd trimester.  It has taken him 2 full weekends to complete most of the demo.  
He started out by knocking down the plaster on the ceiling and walls.

Looking down the hall when you first turn the corner from the stairs.
 (That is the doorway to the bonus room on the left.)

Opposite end of hall.
 (The Bonus Room doorway is now on the right.)

Looking down the hall towards the Guest Room.
 (The hole in the ceiling is the current attic access.)

Opposite view now looking towards the Nursery on the left and the Balcony doorway straight ahead.

The hallway is basically "L" shaped.

Once the plaster was removed, Jim started removing the hallway lath boards.  I put the pic views in the same order as the plaster removal ones for ya.

Can you tell it is dusty up there?

Bonus Room doorway on the right

Looking towards Guest Room

Once again, our attic is exposed.  At least the weather is warmer this time.

Now for something totally different!  Instead of demolition, I've put the final touch on something...
The Family Room curtains!  Yea!
 We finally put up the curtain hold-backs now that the warmer weather has arrived.  The hold-backs match the finials on the front curtain rods.  Sorry the picture is so dark, but it is difficult to take pictures of a window.  :)  Please ignore the Graco infant car seat in the bottom right corner.

Jim took this picture of me while I was making dinner.  I believe we had meatball subs that night.
Did you notice the face on the teapot?  You might have to click on the pic to see it larger.


Friday, December 31, 2010

The road to electrical inspection approval

First and foremost, I have been appointed to show off the new curtains from the exterior of the house. From outdoors, you can see the sheer back layer Amanda talked about earlier. Behold, curtains:
 
I may have mentioned previously that we have been doing some renovation in our second story. Before installing the insulation and drywall upstairs, we needed to pass a rough electrical inspection and address any major findings. However, the conclusion of the essential electrical work has been prolonged for various reasons. The primary cause of delay is a dramatic increase in my professional workload, which has been quite demanding both mentally and physically. We also had a surprise vacation to NYC for a movie premiere in November; what an incredible yet brief trip! Another factor was the process of framing-in the new closets for the bedrooms. After finishing the construction, I was able to wire the closet lights and one additional outlet receptacle. Happily, this phase is complete and both closets are plumb and square.

However, an unexpected delay was encountered while investigating the lighting in the second story hallways. We intended to redesign the hallway lights in order to have three switches to control the lights. Not too big a deal since the studs are exposed, and my dad and I were able to run wiring for one of the 3-way switches and the 4-way switch during all our work in October. While completing the hallway lighting circuit, I looked into the lighting circuit in the stairwell. These lights were connected to one of the chaotic sprawling networks from the basement. The mess behind the two 3-way switches looked something like this:

I suppose we shouldn't be too surprised, but I was nonetheless. The second story switch (shown at left) had several apparently unnecessary wires terminated with tape only. In the box were three different types of wire, including 12/2, 14/2 and a single 12 gauge wire, and nothing was grounded in the metal box. The first story switch (right) was entirely different wiring, indicating that there is a hidden/secret junction box sealed in the wall or ceiling somewhere. The neutral for the first story lamp was 'borrowed' from a receptacle in the adjacent room - I hear that this is called an 'illegal substitution' in football terms. You can see the cloth-insulated wire and the duct tape added for extra flavor. Elsewhere, I found a splice in one of the runner wires simply buried in the attic insulation. After a more thorough investigation, I traced the network back to the source and found the following savory sight:

In conclusion, the stairway lighting circuit was entirely unacceptable. I isolated the circuit and essentially turned off the lights. The wiring for this network has now been entirely replaced and is supplied from the new second story circuit breaker. I was able to run the new 14/2 and 14/3 wire with minimal intrusion in the stairwell walls, and Amanda installed one of the new 3-way switches. 

We had our rough electrical inspection nearly two weeks ago. I was anticipating that the inspector would spend some time and scrutinize my work, but he was done within 10 minutes. With only minor findings, we can close up the walls and continue with the renovation. I just need to find enough time and energy to keep at it.

Wednesday, December 29, 2010

It's Curtains for Us!

First off, I'd like to show everyone our newest ornament for the tree.  I wanted to get something to commemorate 2010 being the year we bought our first house.  I thought this ornament from Hallmark was very sweet.

Now for the real reason of this post...The windows in the family room are very drafty, and they make the room very cold.  I put plastic on the windows, but it doesn't seem to be helping much.  I tried a different (more expensive) brand than last year, but it seems to be worse.  Next year, I will go back to using Frost King since the 3M film doesn't seem to be doing its job.  Anyways, because the family room is where we like to sit and relax, we decided to go ahead and try to remedy the situation.  For the very first time, Jim and I have bought curtains for the house!  Yea!  All the other curtains in our home are the same ones the previous owners left.  Most of them are just a very thin lacy material.  The family room didn't even have curtains, since it had shutters when we first moved in.  I had taken those cobweb encrusted dust magnets off the windows within the first month after moving in.  The shutters are still sitting in my dad's garage as I type.  So, yes, it has taken us almost a year to buy curtains.  
We discovered that curtains are expensive.  Fortunately, the family room only has 3 windows.  We knew we wanted to buy red curtains, but we wanted to make sure that the curtains wouldn't clash with our red couch.  We were able to cut off a piece of the couch fabric in an inconspicuous spot so that we wouldn't have to take an entire couch cushion with us to the store.  Can you see me doing that?  While Jim was shopping at Lowe's.  I went to check out the selection at Bed Bath and Beyond.  I was actually quite surprised and pleased when I saw their selection.  I managed to find exactly what I was looking for: curtains that looked stylish, yet also had insulating and noise reducing properties.  Jim liked the curtains as much as I did, so we bought them.  We had chosen London  Stripe in brick.  We decided not to buy the coordinating valance at that time, but I'd like to at some point in the coming months.  We also bought a sheer panel to go behind the curtains as an extra detail when the curtains are open.    This, however, lead to some unforeseen consequences.  We would need to buy a double rod set, but we didn't like any of the ones that we saw.  We did; however, like some of the single rods.  We figured that we could just buy the single rods and purchase the needed double brackets separately.  Easy enough, right?  WRONG!  We went to 7 different stores looking for double brackets and couldn't find any that were sold by themselves!  What stores did we try you might ask.  Well, we went to Bed Bath and Beyond, Lowe's, Kmart, Kohl's, Walmart, Home Depot, and Sear's Hardware!  Nothing!  We found plenty of single brackets, but no doubles.  Grrrr!  What the heck, peoples?!  Well, we ended up drilling holes in the single brackets that came with the rods we bought and screwed them together to make a double bracket.  Of course, we didn't have the proper drill bit, so we went to Ace Hardware to buy the right one.  Long story short (too late, I know) we finally have curtains hanging in the family room.  As a bonus, I no longer have to worry about the neighbors seeing me work out on my Wii Fit in the morning. ;p  Besides the valances, we also still need to buy the holdbacks.  We figured that could wait until spring/summer.  We plan on keeping the curtains closed for the winter.  I'm hoping these curtains help keep the heat in and the cold out.
And now what you all have been waiting for...the pictures!

The sheer back layer
It is Astor Gold/Wine from Westgate

Close-Up of the Sheer curtain

The front layer with the curtains closed
Do you like the front rod finials?  They are called Orly.  lol.

Jim holding the curtains back to show off the 2 layers together
I know, I should iron them.

The camera didn't quite capture the true color of the curtains, but now you have an idea of what they look like.  I love them.  I've included the holdbacks and valances in our Wish List tab at the top of the page.  Our family room looks more homey now.  Homey, not homely.  :)  It looks more put together despite the pink faux brick wall on one side, the pioneer wall paper on the other, and our Asian decor throughout.  Hahaha!  This is the first room people see when they come in our house, and it does not give the first impression that I'd  like it to.  I told Jim that I should try to get on one of HGTV's shows like "Rate My Space" or something.  Unfortunately, this room is not one of our priority rooms, so it will have to wait.